Today is our tenth day OJT in PANELCO III, as usual we are working today with the MMEE division and will be accompanied by Engr. Darwin and engr. Antonio to go to the staging area. What we are planning today is to repair a transformer that has been damaged and see the inside of the transformer.

To see the inside of the transformer, it is necessary to remove the oil that surrounds the wiring and core of the transformer. This oil is used to cool the transformer while the transformer is working. The thicker the oil is, the transformer can last longer. When we want to dispose of the oil, the suction pump that will be used to dispose of the oil is damaged, so we first repair it. The pump uses a 3 phase motorbike, but the electricity in the socket is a single phase. The technicians use capacitors to make the single phase into 3 phases.


This work takes around 2 hours, so today we only repair the pump engine. But engr. Antonio still teaches us about how the motor works. And again repeat how to test from the transformer

Tidak ada komentar:

Posting Komentar