On this fourth day at 9 am we were invited to Carmen Substation, together with sir dante and sir Sony, there we explained that Panelco III had 9 substations; 1 in Rosales, 1 in Carmen, 2 in Binalonan, 2 in Urdaneta, 1 in Umingan, and 2 in Tayug. Carmen Substation is the latest Substation made by Panelco III. Carmen Substation produced 15MVA in charge of the Carmen East area, and part of Rosales.
On this fourth day at 9 am we were invited to Carmen Substation, together with sir dante and sir Sony, there we explained that Panelco III had 9 substations; 1 in Rosales, 1 in Carmen, 2 in Binalonan, 2 in Urdaneta, 1 in Umingan, and 2 in Tayug. Carmen Substation is the latest Substation made by Panelco III. Carmen Substation produced 15MVA in charge of the Carmen East area, and part of Rosales.
Carmen Substation have a Power Transformer that has 69
kV on the input side and 13.8 kV on the output side. This transformer has
capacity 20/27/33 MVA. Function of this power transformer to decree to se the
voltage from power plants from 69 kV to 13.8 kV, and then continued to
distribution transformer for decrease become 230 V so that can used customer.
The second one is AVR (Automatic Voltage Regulator). The function of the AVR is
to maintain constant voltage and power line conditioning to the equipment load
under a wide variety of conditions, even when the utility input voltage,
frequency or system load vary widely. The others transformer like Potensial
Transformer (PT) and Current Transformer (CT).