February 15, 2019
This is the 9th day of our internship at Panelco III. Today we were invited by the division metering shop to conduct metering installations in balung areas. We left at 9 and arrived at half past eleven, it was a long journey for us. Because urdaneta city with balungao has a considerable distance. We are accompanied by Engr. Rendy, he is an engineer graduating from PSU, and he is a very smart person.
Arriving there the technicians checked the equipment and made observations on the use of electricity at the customer's premises, then they repaired it. The first thing done by a technician from MSD is to find the path that will be used by the customer to the pole based on the amount of capacity to be used. After the path is found next is to connect the power source to the customer's MCB by replacing the cable used, this is done because the current to be used is larger than the previous one. Then connect the secondary part of the transformer to the CT primer, because the current removed from the transformer is high enough to need to be lowered to fit the household electrical equipment. Then the secondary part of the CT is connected to the meter.
The work takes about 3 hours, so this work feels heavy during a strong afternoon. This work was finished at 2pm, after that we returned to the main office.
This is the 9th day of our internship at Panelco III. Today we were invited by the division metering shop to conduct metering installations in balung areas. We left at 9 and arrived at half past eleven, it was a long journey for us. Because urdaneta city with balungao has a considerable distance. We are accompanied by Engr. Rendy, he is an engineer graduating from PSU, and he is a very smart person.
Arriving there the technicians checked the equipment and made observations on the use of electricity at the customer's premises, then they repaired it. The first thing done by a technician from MSD is to find the path that will be used by the customer to the pole based on the amount of capacity to be used. After the path is found next is to connect the power source to the customer's MCB by replacing the cable used, this is done because the current to be used is larger than the previous one. Then connect the secondary part of the transformer to the CT primer, because the current removed from the transformer is high enough to need to be lowered to fit the household electrical equipment. Then the secondary part of the CT is connected to the meter.
The work takes about 3 hours, so this work feels heavy during a strong afternoon. This work was finished at 2pm, after that we returned to the main office.