On the fifth day we have now moved to another division, namely the MEED division headed by Engr. Leo P. Aquino. On our first day in this division, Engr. Leo P. Aquino explained that electrical equipment is used for the installation of substations, poles, and transformers in warehouse equipment in panelco III. He explained about some equipment, for example for grounding, fuse link, socket metering, metering kwh, CT, VT, wire, and so on.
After he finished, he invited us to visit the substation Urdaneta II which is located opposite Panelco III. There Engr. Leo explained the electricity from primary to secondary and the safety part. On the substation Urdaneta II produce a threshold of 30 MVA, and primary voltage of 69KW. The distribution network security system and substation II are the same as those in Carmen.
Then, we were invited by Engr. Jhon to observe the hourly electricity usage seen in the feeder. We observe the use of electricity in the feeder, AVR, PCB, oil temperature at the transformer, and the temperature at the transformer. Then at 3pm the trip happened, and Engr. Jhon took steps to overcome the trip, and the part affected by the trip was a remote area. That day was fun because we could learn many things.
On the fifth day we have now moved to another division, namely the MEED division headed by Engr. Leo P. Aquino. On our first day in this division, Engr. Leo P. Aquino explained that electrical equipment is used for the installation of substations, poles, and transformers in warehouse equipment in panelco III. He explained about some equipment, for example for grounding, fuse link, socket metering, metering kwh, CT, VT, wire, and so on.
After he finished, he invited us to visit the substation Urdaneta II which is located opposite Panelco III. There Engr. Leo explained the electricity from primary to secondary and the safety part. On the substation Urdaneta II produce a threshold of 30 MVA, and primary voltage of 69KW. The distribution network security system and substation II are the same as those in Carmen.
Then, we were invited by Engr. Jhon to observe the hourly electricity usage seen in the feeder. We observe the use of electricity in the feeder, AVR, PCB, oil temperature at the transformer, and the temperature at the transformer. Then at 3pm the trip happened, and Engr. Jhon took steps to overcome the trip, and the part affected by the trip was a remote area. That day was fun because we could learn many things.